2. GPC Product Entry

2. GPC Product Entry

Please follow the steps of the Screen shot








    • Related Articles

    • 2. GPK & GPC Product Entry in NOW

      For GPK Sales Order, you need to enter 2 products 1. GPK Product 2. GPC Product Please see the attached file
    • 5. GPC BOM Entry in ERP1.0

      See the below steps 1. Login in ERP1.0 2. Go to BOM List 3. Search by Work Order No. 4. Create GPC BOM 5. Confirm to Material Planner 6. Communicate with Textile Team about FSS & Item Code 7. Get confirmation from Textile team 8. Send the BOM to NOW ...
    • KFF/KGF ITEM CODE MISSING

      ITEM CODE – KFF/KGF KFF/KGF ITEM CODE MISSING[A1] Raised Issue · BOM cannot be sent to NOW · Full Item Code is not showing in BOM Lines Problem Analysis 1. BOM Analyze a. BOM Status b. Open ERP1.0 GPC BOM c. Have a look at FULL ITEM CODE for each ...
    • Consumption Error in GPC BOM

      Consumption Error in GPC BOM (see the attachment)
    • 3. Sales Order Entry

      See the below steps 1. Login in NOW 2. Open Sales Order interface 3. Create Sales Order Please see the attached video