5. GPC BOM Entry in ERP1.0
See the below steps
1. Login in ERP1.0
2. Go to BOM List
3. Search by Work Order No.
4. Create GPC BOM
5. Confirm to Material Planner
6. Communicate with Textile Team about FSS & Item Code
7. Get confirmation from Textile team
8. Send the BOM to NOW
Please see the attached video.
Related Articles
Consumption Error in GPC BOM
Consumption Error in GPC BOM (see the attachment)
ITEM CODE IS UNAVAILABLE on BOM
ITEM CODE IS UNAVAILABLE on BOM BOM doesn’t send to NOW (White Spaces) Raised Issue · BOM doesn’t send to NOW · BOM Lines contain no Full Item code Problem Analysis · Open ERP1.0 GPC BOM · Have a look at FULL ITEM CODE for each line · Check design id ...
Color Choosing Error in GPC BOM
Color Choosing Error in GPC BOM (see attachment) Drop Files to Attach
2. GPK & GPC Product Entry in NOW
For GPK Sales Order, you need to enter 2 products 1. GPK Product 2. GPC Product Please see the attached file
4. GPC BOM Creation in ERP1.0
See the below steps 1. Login in ERP1.0 2. Go to BOM List 3. Search by Work Order No. 4. Create GPC BOM 5. Confirm to Material Planner 6. Communicate with Textile Team about FSS & Item Code 7. Get confirmation from Textile team 8. Send the BOM to NOW ...