5. GPC BOM Entry in ERP1.0

5. GPC BOM Entry in ERP1.0

See the below steps
1. Login in ERP1.0
2. Go to BOM List
3. Search by Work Order No.
4. Create GPC BOM
5. Confirm to Material Planner
6. Communicate with Textile Team about FSS & Item Code
7. Get confirmation from Textile team
8. Send the BOM to NOW

Please see the attached video.





    • Related Articles

    • ITEM CODE IS UNAVAILABLE on BOM

      ITEM CODE IS UNAVAILABLE on BOM BOM doesn’t send to NOW (White Spaces) Raised Issue · BOM doesn’t send to NOW · BOM Lines contain no Full Item code Problem Analysis · Open ERP1.0 GPC BOM · Have a look at FULL ITEM CODE for each line · Check design id ...
    • Consumption Error in GPC BOM

      Consumption Error in GPC BOM (see the attachment)
    • Color Choosing Error in GPC BOM

      Color Choosing Error in GPC BOM (see attachment) Drop Files to Attach
    • 2. GPK & GPC Product Entry in NOW

      For GPK Sales Order, you need to enter 2 products 1. GPK Product 2. GPC Product Please see the attached file
    • KFF/KGF ITEM CODE MISSING

      ITEM CODE – KFF/KGF KFF/KGF ITEM CODE MISSING[A1] Raised Issue · BOM cannot be sent to NOW · Full Item Code is not showing in BOM Lines Problem Analysis 1. BOM Analyze a. BOM Status b. Open ERP1.0 GPC BOM c. Have a look at FULL ITEM CODE for each ...