KFF/KGF ITEM CODE MISSING

KFF/KGF ITEM CODE MISSING

ITEM CODE – KFF/KGF

KFF/KGF ITEM CODE MISSING[A1] 

 

Raised Issue

·       BOM cannot be sent to NOW

·       Full Item Code is not showing in BOM Lines

Problem Analysis

1.       BOM Analyze

a.      BOM Status

b.      Open ERP1.0 GPC BOM

c.      Have a look at FULL ITEM CODE for each line

2.      Check FSS Document

a.      Go to Base > Product > List of Items > KGF (Textile)

                                                    i.     Find Full Item/Product Code


 

3.      Check Document Data

a.      select * from erp_fssdocument where fssnumber='FSS-15987'

b.      Look for string mismatch

4.      Check for the data duplication in ERP1.0 Master Data Library.
Check the segment below:
Base > Master Data Library
Look for: Ctrl + F

                                                    i.     Fabric_design_type

                                                   ii.     Composition

                                                 iii.     Construction

                                                  iv.     GSM

                                                   v.     open_tube

                                                  vi.     fabric width

                                                vii.     ytem

Solution

Step 01: 

·       Fix the duplicate entries

·       Fix misspelled database field entry




    • Related Articles

    • ITEM CODE IS UNAVAILABLE on BOM

      ITEM CODE IS UNAVAILABLE on BOM BOM doesn’t send to NOW (White Spaces) Raised Issue · BOM doesn’t send to NOW · BOM Lines contain no Full Item code Problem Analysis · Open ERP1.0 GPC BOM · Have a look at FULL ITEM CODE for each line · Check design id ...
    • 5. GPC BOM Entry in ERP1.0

      See the below steps 1. Login in ERP1.0 2. Go to BOM List 3. Search by Work Order No. 4. Create GPC BOM 5. Confirm to Material Planner 6. Communicate with Textile Team about FSS & Item Code 7. Get confirmation from Textile team 8. Send the BOM to NOW ...
    • 4. GPC BOM Creation in ERP1.0

      See the below steps 1. Login in ERP1.0 2. Go to BOM List 3. Search by Work Order No. 4. Create GPC BOM 5. Confirm to Material Planner 6. Communicate with Textile Team about FSS & Item Code 7. Get confirmation from Textile team 8. Send the BOM to NOW ...